Welcome to Shenzhen sikaiwei Wiring Equipment Co., Ltd.

  • Set home
  • Online inquiry
  • Chinese

Logo

search
service hotline

Logo

search
FAQ
Home>>FAQ

Pressing type electromagnetic shielding joint installation diagram

Release time:2019-11-12 10:48:31

Installation method
 
 
 
Strip the outer sheath of the cable and the shielding layer, and cut about 15MM along the circumference of the outer sheath.
 
Pass the cable out of the cable gland, remove the outer sheath, and laminate the shield on the shield cone
 
 
 
Shielding ring compression shield
 
Put in the connector body, tighten the nut, and install it.

Recommend products

Scan code public concern No

Scan code public concern No

Customer service hours(9:00~18:00)

13760140076

CopyRight © 2010 All Rights Reserved.  Shenzhen sikaiwei Wiring Equipment Co., Ltd

网站ICP备案号:粤ICP备17002429号
  • 此站支持多端浏览此站支持多端浏览